ArchiveCaruso Homes March 2024


Archive - Caruso Homes - March 2024

Testimonials Hear
From Our
Customers

MORE TESTIMONIALS

We settled on our Caruso Home over the summer and did not have part of the basement finished because we wanted to do it over the winter our way. We started work on the unfinished basement this weekend and the first thing the contractor said was that he was amazed by the workmanship throughout the home. As he worked in the unfinished basement of the home he felt the need to pull me to the side and inform me that he was amazed by the straight on point measurements of the framing and how level the framing was in the vertical and horizontal runs. The fact that our steel load bearing joists were soldered to columns was an extra touch of workmanship he rarely sees from contractors and/or builders he informed me. As he stated to us, a good home is defined by the details of what lies behind the walls as much as what can be seen at the walls. Caruso met this criteria and built our dream home. Means a lot to me to have another professional talk about the workmanship and quality of our builder. We knew we had a good builder and this just reaffirmed what we already knew. Thank you Gar Edmondson, Robert Burch and Tom Baldwin for building our dream home at Monroe Landing.